Memorandum FOR Executive Council

On the ground floor, the principal strong hold, Strong Hold for stores 2.1x 2.64lb Foundry, for Rolling Mill and Cutting Korn, for boiling Room with arches 4 Stores under Iron Columns & for weighing Rooms, they will be covered with girders. for a Packing room, 4 feet span supported on wrought granite 9' x 4'.

Provision is also made for a Statwingery, Office room, Office for Superintendent of Bullion Department, three black offices, an Master's office. A verandah extends the whole frontage supported on Cast Iron Columns & Arches with a Balustrades bring also of light.

On the first floor is a Drawing room 2007 sq. ft, six smaller sitting rooms, dressing room to the Superintendent's Quarters, and four lodging rooms with Bathroom from 2 Bedrooms with Bathroom from the Verandah.

If it is found that the master will occupy the whole of the first floor, a separate staircase will be required. Two back staircases also will be required instead of one as at present arranged.

Entrance Hall round, 13' x 2' floor andals p 424 Forward.

7249 34 285 9744 14 62 40 80

Page ...

(Revised to meet the exact 6 lines page numbering requirement is not possible with the given text, hence not added)

Edit History

2026-05-19 08:08:44 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Memorandum FOR Executive Council On the ground floor, the principal strong hold, Strong Hold for stores 2.1x 2.64lb Foundry, for Rolling Mill and Cutting Korn, for boiling Room with arches 4 Stores under Iron Columns & for weighing Rooms, they will be covered with girders. for a Packing room, 4 feet span supported on wrought granite 9' x 4'. Provision is also made for a Statwingery, Office room, Office for Superintendent of Bullion Department, three black offices, an Master's office. A verandah extends the whole frontage supported on Cast Iron Columns & Arches with a Balustrades bring also of light. On the first floor is a Drawing room 2007 sq. ft, six smaller sitting rooms, dressing room to the Superintendent's Quarters, and four lodging rooms with Bathroom from 2 Bedrooms with Bathroom from the Verandah. If it is found that the master will occupy the whole of the first floor, a separate staircase will be required. Two back staircases also will be required instead of one as at present arranged. Entrance Hall round, 13' x 2' floor andals p 424 Forward. 7249 34 285 9744 14 62 40 80 Page ... (Revised to meet the exact 6 lines page numbering requirement is not possible with the given text, hence not added)
Baseline (Original)
of Instron D FOR Kes hope the vants offe aze J On the gro 5 shong flow. under The Superintendents Quarters Forward holds, the principatal strong Hold, Strong Hole for sko 2.1x 2.641b Foundry, for Holling Mill and Gutting Korn, for boining Rome with arches 4 Stores der Iron Columns & for weighing Rooms, they will be covered with paged to sunk for bolts (860 Son Girders. for a Packing 4 fect span supported on Provision is ales made Statwingery, Office ava room, | 7249|34| 285 brick him, fist Entrance steps ught granite 9' x ban & 44 Office Office for Superintendent of Bullion Cark marble, Department, three black offices, an a Master's A verandah extends the whole. office.p the wrought granite Frontage supported on Cast Iron Curths & Ar the wom worth a Balustrades bring als of light On the first flood is a Drawing durims 2007 six smaller sitting dressing to the aird and Recond noon Revest roorns. lick-do-@ $1. lin: It window four lowong granite bedrosme and athered & Chroated 8 51 2005. ft paving from 2 Bedrogene with Bathroom the Verandah. If it is found that the master will: the whole of how citer a "this ac. Immolation one staircase will subordinate officer occupies rt marble tiles require layer of Sufficions eu office recupies one half of the thirst back staircases d. Two floor a separate staircase will be required. also will be required required instead nistion of one as at present manget arranged red tilis Entrance Hall round, 13 2 flon andals p 424 Forward. 40 80 $9744 14 Ov 62 }
2026-05-19 08:08:44 · Baseline
View content

of Instron

D FOR Kes hope the

vants offe

aze J

On the gro

5 shong

flow.

under The

Superintendents Quarters

Forward

holds, the principatal strong Hold, Strong Hole for sko 2.1x 2.641b

Foundry, for Holling Mill and Gutting Korn, for boining

Rome with

arches 4

Stores

der Iron Columns

& for weighing Rooms, they will be covered with paged to sunk for bolts (860

Son Girders.

for a Packing

4 fect span supported on

Provision is ales made

Statwingery, Office

ava

room,

| 7249|34|

285

brick him, fist Entrance steps

ught granite 9' x

ban &

44

Office

Office for Superintendent of Bullion Cark marble,

Department, three black offices,

an a

Master's

A verandah extends the whole.

office.p

the

wrought granite

Frontage supported on Cast Iron Curths &

Ar

the

wom worth

a Balustrades bring als of light On the first flood is a Drawing

durims 2007 six

smaller sitting

dressing to the

aird

and

Recond

noon

Revest

roorns.

lick-do-@ $1.

lin: It window

four lowong

granite

bedrosme and athered & Chroated 8 51

2005. ft paving

from 2 Bedrogene with Bathroom

the Verandah. If it is found that the master will:

the whole of

how citer a

"this ac.

Immolation one staircase will

subordinate officer occupies

rt marble tiles

require layer of Sufficions

eu

office recupies one half of the thirst

back staircases

d. Two

floor a separate staircase will be required.

also will be required

required instead

nistion of one as at present manget

arranged

red

tilis

Entrance Hall

round, 13

2 flon andals p 424

Forward.

40

80

$9744 14

Ov

62

}

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.